What makes it different · Public Procurement
Administered, Not Negotiated
Most essential facilities are public projects, which brings a formal process that shapes how the work is bought and administered.
The facility type, whether it is a new build or a hardening project, and the procurement route. That is enough to start.
Operational
Not "survives the storm" — works during and after it
Category IV
A different design standard, not a higher one
Public work
Bonded, documented, formally administered
Licensed
General contractor, licensed in the state of Florida
Informal agreements become audit findings
On private work, a change can be agreed on site and papered afterwards. On public work the documentation is the record, it is subject to scrutiny, and an informally agreed change creates a problem for the agency rather than for the contractor. The process has to be followed from the first change.
What it involves
- Bonding and insurance to the required levels.
- A prescribed procurement route rather than a chosen one.
- Formal change order process from the first change.
- Documentation and reporting to a public standard.
- Payment and retainage under public contracting rules.
How we handle it
- 01Work within the prescribed procurement process.
- 02Provide bonding and insurance as required.
- 03Handle every change formally, from the first one.
- 04Maintain documentation to the standard required.
- 05Support the agency's reporting obligations.
Handle the first change formally, however small and however obviously agreed. It sets the pattern for the project, and a job that starts with informal agreements produces an audit trail with gaps in it.
Said plainly
Where we stop
We are not procurement advisers. Your purchasing office and counsel determine the applicable process; we work within it.
FAQ
Common questions
- Is public procurement different?
- The route is frequently prescribed, and documentation is the record and is scrutinized.
- Can changes be agreed informally?
- They should not be. It creates gaps in the audit trail.
- Is bonding required?
- Generally, to specified levels.
- Do you advise on procurement?
- No. Your purchasing office and counsel do.
What we build
Fire Stations
Apparatus bays, living quarters and a structure that has to launch a response during the event everybody else is sheltering from.
Read more →
EMS Facilities
Ambulance bays, supply and medication storage, crew quarters, and a layout that does not cost seconds on the way out.
Read more →
Emergency Operations Centers
Where a county or city coordinates its response. It has to be habitable, powered, connected and staffed through the worst of it.
Read more →
Shelters
Purpose-built shelters and buildings — frequently schools — designed or retrofitted to shelter standard.
Read more →
Utility & Public Works
Water and wastewater facilities, pump stations, fleet and public works buildings — infrastructure that has to run through and after an event.
Read more →
Hardening Existing Buildings
Upgrading an existing facility toward an operational standard, where the value is entirely in finding what will fail first.
Read more →
More what makes it different
The Operational Standard
Building codes assign essential facilities a higher risk category, and the intent is that they keep working — not simply that they do not collapse.
Read more →
The Envelope
The envelope is the difference between a building that keeps working and one that is open to weather with everything inside it ruined.
Read more →
Power
Backup power for an essential facility means running the whole operation for a realistic duration, not keeping the lights on.
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.