Essential Facility Questions

Written for agencies, districts and municipal owners.

The facility type, whether it is a new build or a hardening project, and the procurement route. That is enough to start.

FAQ

Essential and emergency facilities in Florida

Is it just a stronger building?
No. The objective is that it keeps functioning.
What should be defined first?
Duration, occupancy and which functions must continue.
Why does one opening matter?
A breach pressurizes the building from inside.
What counts as an opening?
Windows, all doors, hatches, skylights, louvres and service penetrations.
Where do protective assemblies fail?
At the attachment.
Can assembly components be substituted?
No.
How big should the generator be?
Sized to what has to run, including cooling.
How much fuel?
Enough for the realistic duration without resupply.
Where should generation sit?
Above flood elevation, with fuel and switchgear.
Is cooling optional?
In Florida it is a habitability requirement.
What makes redundancy real?
Physically separated paths.
What gets missed in hardening?
Hatches, louvres, rooftop equipment and overhead doors.
Is public procurement different?
Prescribed route, formal changes, scrutinized documentation.
Can changes be agreed informally?
They should not be.
Is this code advice?
No. Your design professional and the authority decide.

Still not answered?

Call (954) 807-3208. Tell us the facility type and whether it is new build or hardening.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.