What we build · Emergency Operations Centers

The Building That Runs the Response

Where a county or city coordinates its response. It has to be habitable, powered, connected and staffed through the worst of it.

The facility type, whether it is a new build or a hardening project, and the procurement route. That is enough to start.

Operational

Not "survives the storm" — works during and after it

Category IV

A different design standard, not a higher one

Public work

Bonded, documented, formally administered

Licensed

General contractor, licensed in the state of Florida

Redundancy is only as good as its weakest single point

An EOC has dual power, dual communications and a hardened envelope, and it still fails if both feeds run through the same conduit, or the fuel line crosses an area that floods, or the antenna mast was designed to an ordinary standard. Genuine redundancy means physically separated paths, and that is a construction question.

What has to be independent

  • Power feeds and generation, with fuel stored on site.
  • Communications paths, physically separated rather than nominally dual.
  • Water and sanitation for a facility staffed continuously.
  • The envelope, including every opening and penetration.
  • Antenna and mast structures, at the same standard as the building.

How we handle it

  1. 01Build genuinely separated redundant paths, not parallel ones.
  2. 02Site generation and fuel above flood elevation.
  3. 03Harden every opening, including the ones nobody lists.
  4. 04Build mast and antenna support to the facility standard.
  5. 05Commission under realistic failure scenarios.

Trace the redundant paths physically. Two feeds sharing a conduit, a chase or a wall penetration are not redundant, and that is discovered during commissioning if somebody looks and during an event if nobody does.

Said plainly

Where we stop

We build to the design. Where a redundancy looks nominal rather than physical, we will raise it rather than install it as drawn and let it be discovered later.

FAQ

Common questions

What makes redundancy real?
Physically separated paths. Two feeds in one conduit are not redundant.
Where should fuel be stored?
On site, above flood elevation, with enough duration for the event.
Do antennas need hardening?
To the same standard as the building. A failed mast is a failed EOC.
How is it commissioned?
Under realistic failure scenarios, not just a start test.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.